Citrus (Orange/Lemon) runs a 365-day season with water demand peaking at a crop coefficient of 0.65. On a hot mid-summer day (ETo of 6 mm), that is about 3.9 mm per day, or 27 mm (1.1 inches) per week. Every number on this page comes from the FAO-56 standard and is exactly what RainRule schedules with.

Season length

365 days

60 + 90 + 120 + 95 by stage

Root depth

1.2 m

≈ 3.9 ft at maturity

Peak daily use

3.9 mm

at mid-season, ETo 6 mm/day

Depletion threshold

50%

of available water before stress

Crop coefficient (Kc) through the season

Multiply any day's reference evapotranspiration (ETo) by the Kc below to get Citrus (Orange/Lemon)'s actual water use that day.

0.250.500.751.00InitialDevelopmentMid-seasonLateDays after planting (0-365)
Growth stages, lengths, and Kc values for Citrus (Orange/Lemon)
StageLengthKcWhat's happening
Initial60 days0.65Establishment: bare soil dominates, low water use
Development90 days0.65 → 0.65Canopy closes; demand ramps day by day
Mid-season120 days0.65Full canopy: peak water use, most stress-sensitive
Late season95 days0.65 → 0.65Maturation: demand tapers toward harvest

Refill points by soil type

Total available water (TAW) is what your soil holds across Citrus (Orange/Lemon)'s 1.2 m root zone. Irrigate when the running deficit crosses the refill point (RAW), 50% of TAW for Citrus (Orange/Lemon), so the crop never enters stress.

TAW and RAW for Citrus (Orange/Lemon) by soil type
SoilHolds (TAW)Irrigate at (RAW)Days of peak use per refill
Sand84 mm42 mm~10 days
Sandy Loam144 mm72 mm~18 days
Loam180 mm90 mm~23 days
Silt Loam204 mm102 mm~26 days
Clay Loam192 mm96 mm~24 days
Clay168 mm84 mm~21 days

Sandy soils hold the least water, so Citrus (Orange/Lemon) on sand needs small, frequent irrigations; clay holds the most and supports longer intervals with bigger applications.

Worked example: a peak-summer week

Take Citrus (Orange/Lemon) at mid-season on a week averaging an ETo of 6 mm/day:

  • Daily crop use: 6 mm × Kc 0.65 = 3.9 mm/day
  • Weekly demand: 3.9 × 7 = 27.3 mm (1.1 inches)
  • On loam (90 mm refill point), a full profile lasts about 23 days with no rain before irrigation is due.

Real weeks aren't averages: ETo swings with heat waves and rain changes everything. That's the gap between a rule of thumb and a live schedule.

Get a live schedule for your citrus (orange/lemon) field

The free calculator combines these coefficients with your field's actual 7-day forecast. Or start a trial and let RainRule track your real water balance every hour.